Production order

From ZUGSEIL Wiki
Revision as of 07:10, 5 November 2024 by Stefanseiler (talk | contribs)
Jump to navigation Jump to search

When a production order was placed, it has to undergo these steps:

  • Checking for acceptance
  • Production planning - This means blocking resources (material, HR, machine capacity) for this production order
  • Production - This means production floor tracking and production
  • Production Quality Control checking - This means confirmation of the quality of the products
  • Taking into stock

Related articles