Production order
Revision as of 19:44, 5 November 2024 by Stefanseiler (talk | contribs)
When a production order was placed, it has to undergo these steps:
- Checking for acceptance
- Production planning - This means blocking resources (material, HR, machine capacity) for this production order
- Production - This means production floor tracking and production
- Production Quality Control checking - This means confirmation of the quality of the products
- Taking into stock
Related articles
- Fulfillment - Production of items demanded by the organization is one possible way of internal demand fulfillment. Also production required materials, which have to become fulfilled for production to take place.