Difference between revisions of "ZUGSEIL Lifecycle Management"
Jump to navigation
Jump to search
Stefanseiler (talk | contribs) |
Stefanseiler (talk | contribs) |
||
Line 5: | Line 5: | ||
* Ensuring operational readiness of critical items (security checks) | * Ensuring operational readiness of critical items (security checks) | ||
* Refurbishing cycles (laundry) | * Refurbishing cycles (laundry) | ||
Integrates with | |||
* [[ZUGSEIL Shop]] - determine directly throughout the shopping process the first station of the lifecycle. This can save a lot of time and effort that procurement and assignment can be done in one step. Assignment of assets is supported by our [[ZUGSEIL SHOP Extension - Personal Equipment Management (SHOP-PEM)|Personal Equipment extension]] and the | |||
== Related Articles == | == Related Articles == |
Revision as of 07:27, 11 February 2023
Reasons for LCM
- Tracking of assets over their entire lifecycle across company borders
- Ecological footprint (Reuse scenarios of goods)
- Ensuring operational readiness of critical items (security checks)
- Refurbishing cycles (laundry)
Integrates with
- ZUGSEIL Shop - determine directly throughout the shopping process the first station of the lifecycle. This can save a lot of time and effort that procurement and assignment can be done in one step. Assignment of assets is supported by our Personal Equipment extension and the