Difference between revisions of "Production order"
Jump to navigation
Jump to search
Stefanseiler (talk | contribs) |
Stefanseiler (talk | contribs) |
||
Line 7: | Line 7: | ||
* Production Quality Control checking - This means confirmation of the quality of the products | * Production Quality Control checking - This means confirmation of the quality of the products | ||
* Taking into stock | * Taking into stock | ||
== Related articles == | |||
* [[Fulfillment]] |
Revision as of 07:10, 5 November 2024
When a production order was placed, it has to undergo these steps:
- Checking for acceptance
- Production planning - This means blocking resources (material, HR, machine capacity) for this production order
- Production - This means production floor tracking and production
- Production Quality Control checking - This means confirmation of the quality of the products
- Taking into stock