Difference between revisions of "Production order"
Jump to navigation
Jump to search
Stefanseiler (talk | contribs) |
Stefanseiler (talk | contribs) |
||
Line 1: | Line 1: | ||
[[Category:Order Types and related objects]] | [[Category:Order Types and related objects]] | ||
When a production order was placed, it has to undergo these steps: | |||
* Checking for acceptance | |||
* [[Production planning]] - This means blocking resources (material, HR, machine capacity) for this production order | |||
* Production - This means production floor tracking and production | |||
* Production Quality Control checking - This means confirmation of the quality of the products | |||
* Taking into stock |
Revision as of 07:06, 5 November 2024
When a production order was placed, it has to undergo these steps:
- Checking for acceptance
- Production planning - This means blocking resources (material, HR, machine capacity) for this production order
- Production - This means production floor tracking and production
- Production Quality Control checking - This means confirmation of the quality of the products
- Taking into stock