Difference between revisions of "Development Sprint Planning 25.11 - 06.12"

From ZUGSEIL Wiki
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 201: Line 201:
!FE
!FE
BE
BE
!W-42
23.-27.09.
!W-43
!W-43
<u>Sprint-01</u> 30.09.-04.10.
<u>Sprint-01</u> 30.09.-04.10.
Line 218: Line 216:
<u>Sprint-04</u> 11.11.-15.11.
<u>Sprint-04</u> 11.11.-15.11.
!W-50
!W-50
<u>Sprint-05</u> 18.11.-22.11.
<u>Sprint-04</u> 18.11.-22.11.
!W-51
!W-51
<u>Sprint-05</u> 25.11.-29.11.
<u>Sprint-05</u> 25.11.-29.11.
!W-52
<u>Sprint-05</u> 02.12.-06.12.
!Promises / Customer Info / Comments
!Promises / Customer Info / Comments
|-
|-
| rowspan="4" |[[App:ZUGSEIL Shop|'''Shop R3.3''']]
| rowspan="2" |[[App:ZUGSEIL Shop|'''Shop R3.3''']]
Release 1: Reach BLT Testing
Release 1: Reach BLT Testing


{{Yellow-Tag|Text=Includes Direct Handout Screen (with regular shipment as now), but not direct handout process, which is triggered after checkout}}.
{{Yellow-Tag|Text=Includes Direct Handout Screen (with regular shipment as now), but not direct handout process, which is triggered after checkout}}.
| rowspan="8" |ZS-SP-0002
| rowspan="4" |ZS-SP-0002
| rowspan="2" |[[Dev:EMA - Product Details Screen]]
(is [[Dev:ZUGSEIL SHOP - Product Details Screen]])
|FE
|
|
|
|
|
|
|
|
|
|
| rowspan="2" |Presentations with SBB and BLT went fine {{Done}}
|-
|BE
|
|
|
|
|
|
|
|
|
|
|-
| rowspan="2" |[[Dev:ZUGSEIL Shop - Checkout Screens Flow|App:ZUGSEIL Shop Checkout]]
| rowspan="2" |[[Dev:ZUGSEIL Shop - Checkout Screens Flow|App:ZUGSEIL Shop Checkout]]
|FE
|FE
Line 304: Line 277:
|-
|-
|BE
|BE
|
|
|
|
|
|
|
|
|
|
|-
|Deployment BLT
|
|
|All
|
|
|
|
|
|
|
|
|
|They do not require RTP, so we can upgrade the entire project to new SOS and RTN and deploy. Move Cache Data Retrieval in Shop-API with SOS-Triggers and SOS-Answers and self-Use the cahe on startup for own digital, so we need to restart the service until we have the final solution. Meeting for explanation is planned.
|-
|Moving logic from Connectors to E-BusinessCache
|Ivan
|
|90%
|
|
|
|
Line 349: Line 292:
| rowspan="2" |
| rowspan="2" |
|FE
|FE
|
|Živko
|Živko
| rowspan="2" |{{Yellow-Tag|Text=QA testing}}
| rowspan="2" |{{Yellow-Tag|Text=QA testing}}
| rowspan="2" |{{Green-Tag|Text=Done}}
| rowspan="2" |{{Green-Tag|Text=Done}}
|
|
|
|
|
Line 362: Line 305:
|-
|-
|BE
|BE
|Nikola
|
|
|Nikola
|
|
|
|
Line 375: Line 318:
| rowspan="2" |
| rowspan="2" |
|FE
|FE
|
|
|
|Zivko
|Zivko
Line 383: Line 325:
|80%{{Red-Tag|RedText=blocked}}
|80%{{Red-Tag|RedText=blocked}}
|80%{{Red-Tag|RedText=blocked}}
|80%{{Red-Tag|RedText=blocked}}
|
|
|
|
|
Line 388: Line 331:
|-
|-
|BE
|BE
|
|
|
|Nikola
|Nikola
Line 396: Line 338:
|80%{{Red-Tag|RedText=blocked}}
|80%{{Red-Tag|RedText=blocked}}
|80%{{Red-Tag|RedText=blocked}}
|80%{{Red-Tag|RedText=blocked}}
|
|
|
|
|
Line 435: Line 378:
| rowspan="2" |[[App:Measuring-In]] - Product configuration
| rowspan="2" |[[App:Measuring-In]] - Product configuration
|FE
|FE
|{{Yellow-Tag|Text=QA testing}}
|
|
|
|
|
Line 447: Line 390:
|-
|-
|BE
|BE
|{{Yellow-Tag|Text=QA testing}}
|
|
|
|
|
Line 460: Line 403:
| rowspan="2" |[[App:Measuring-In]] - Body measurements
| rowspan="2" |[[App:Measuring-In]] - Body measurements
|FE
|FE
|95%
|
|
|
|
|
Line 472: Line 415:
|-
|-
|BE
|BE
|95%
|
|
|
|
|
Line 489: Line 432:
|BE
|BE
|Trajko
|Trajko
|Trajko
|
|
|
|
|
Line 505: Line 448:
| rowspan="2" |
| rowspan="2" |
|FE
|FE
|
|
|
|
|
Line 513: Line 455:
| rowspan="2" |{{Yellow-Tag|Text=QA testing}}
| rowspan="2" |{{Yellow-Tag|Text=QA testing}}
| rowspan="2" |{{Green-Tag|Text=Done}}
| rowspan="2" |{{Green-Tag|Text=Done}}
|
|
|
|
|
Line 518: Line 461:
|-
|-
|BE
|BE
|
|
|
|
|
Line 524: Line 466:
|Nikola
|Nikola
|10%
|10%
|
|
|
|
|
Line 531: Line 474:
| rowspan="2" |Extensions on [[App:Warehouse area administration|Warehouse area]] for "exclusive shipments" flag
| rowspan="2" |Extensions on [[App:Warehouse area administration|Warehouse area]] for "exclusive shipments" flag
|FE
|FE
|
|
|
|
|
Line 539: Line 481:
|Zivko
|Zivko
|{{Green-Tag|Text=Done}}
|{{Green-Tag|Text=Done}}
|
|
|
|
|
Line 544: Line 487:
|-
|-
|BE
|BE
|
|
|
|
|
Line 552: Line 494:
|Nikola
|Nikola
|{{Green-Tag|Text=Done}}
|{{Green-Tag|Text=Done}}
|
|
|
|
|
Line 557: Line 500:
| rowspan="2" |Extensions on [[App:Stocktaking|Stocktaking]] app for new inventory type "pick up shipment stocktaking"
| rowspan="2" |Extensions on [[App:Stocktaking|Stocktaking]] app for new inventory type "pick up shipment stocktaking"
|FE
|FE
|
|
|
|
|
Line 566: Line 508:
|60%
|60%
|100%
|100%
|{{Green-Tag|Text=Done}}
|
|
|
|
|-
|-
|BE
|BE
|
|
|
|
|
Line 579: Line 521:
|60%
|60%
|100%
|100%
|{{Green-Tag|Text=Done}}
|
|
|
|
Line 586: Line 529:
|
|
|
|
|
|
|
|Zivko
|
|
|
|
|
|
|
|
|Zivko
|0%
|0%
|0%
|
|
|-
|-
Line 599: Line 542:
|
|
|
|
|
|
|
|Nikola
|
|
|
|
|
|
|
|
|Nikola
|0%
|0%
|0%
|
|
|-
|-
|Unplanned WPC (MVC) extensions
|Unplanned WPC (MVC) extensions
|BE
|BE
|
|
|
|
|
Line 620: Line 562:
|0%
|0%
|100%
|100%
|{{Green-Tag|Text=Done}}
|
|
|
|
|-
|-
| rowspan="2" |[[App:Catalog designer|Catalog Designer]] - Skinny version [https://jira.b-op.org/browse/DEV-490 specified in this story]
| rowspan="6" |[https://jira.b-op.org/browse/DEV-583 ERP sprint 05] features and extensions
|
| rowspan="2" |
|
| rowspan="2" |PO pool manger - cost controlling extensions + feedback
|FE
|FE
|
|
Line 634: Line 577:
|
|
|
|
|
|Petar
|
|90%
|
|{{Green-Tag|Text=Done}}
|
|
|-
|-
|
|
|BE
|BE
|
|
Line 649: Line 590:
|
|
|
|
|
|Ivan
|
|100%
|
|{{Green-Tag|Text=Done}}
|
|
|-
|-
| rowspan="2" |[[App:Catalog distribution manager|Catalog Distribution Manager]] - Skinny version [https://jira.b-op.org/browse/DEV-495 specified in this story]
| rowspan="2" |
|
| rowspan="2" |Article / Product extension (variants generator for IROC)
|
|FE
|FE
|
|
Line 665: Line 605:
|
|
|
|
|
|Zivko
|
|90%
|
|{{Green-Tag|Text=Done}}
|
|
|-
|-
|
|
|BE
|BE
|
|
Line 680: Line 618:
|
|
|
|
|
|Ivan
|
|100%
|
|{{Green-Tag|Text=Done}}
|
|
|-
|-
| rowspan="2" |[[App:Catalog subscription manager|Catalog Subscription Manager]] - Skinny version [https://jira.b-op.org/browse/DEV-500 specified in this story]
| rowspan="2" |
|
| rowspan="2" |PO pool manager - Pool templates creation
|
|FE
|FE
|
|
Line 696: Line 633:
|
|
|
|
|
|Petar
|
|0%
|
|90%
|
|
|-
|-
|
|
|BE
|BE
|
|
Line 711: Line 646:
|
|
|
|
|
|Ivan
|
|0%
|
|90%
|
|
|}
|}
==Related articles==
==Related articles==
*[[Dev:Product Development]]
*[[Dev:Product Development]]

Latest revision as of 10:50, 6 December 2024

Team availability

This map holds the ZUGSEIL product development team and its planned availability during the upcoming days. If anything changes to this availability, please notify the line and the product manager as soon as possible.

Mon Tue Wed Thu Fri Mon Tue Wed Thu Fri
Name Function 25.11. 26.11 27.11 28.11 29.11 02.12 03.12 04.12 05.12 06.12
Stefan Seiler Product Owner
Rene Schneider Process Quality Manager
Christiane Hornemann UI Quality Manager
Davor Ciric Senior Delivery Manager
Tijana Bezbradica Delivery Manager
Ilija Bubanj Quality Engineer
Nikola Kerkez Backend Developer
Petar Ilic Frontend developer
Aleksandar Lazic Frontend developer
Zivko Rankovic Frontend developer
Ivan Juras Backend developer
Nebojsa Trajkovic B-Op developer

Regular vacation requests are applied to over this page, please.

Development tasks

This contains the tasks at the entire team. Each week contains these information according to the progess of the task:

  • Phase 1: RFD Ready for Development
  • Phase 2: In development --> Progress in %
  • Phase 3: DEV testing - Developers finished development but are doing QA on their code
  • Phase 4: QA testing - QA is having this on their table
  • Phase 5: Fixing - QA returned with some flaws
  • Phase 6: Code review - The code will be reviewed
  • Phase 7: Done - Ready for deployment

Planned Tasks

TOPIC/Project

Task creation

WBS / Project FE

BE

W-43

Sprint-01 30.09.-04.10.

W-44

Sprint-01 07.-11.10.

W-45

Sprint-02 14.-18.10.

W-46

Sprint-02 21.-25.10.

W-47

Sprint-03 28.10.-01.11.

W-48

Sprint-03 04.11.-08.11.

W-49

Sprint-04 11.11.-15.11.

W-50

Sprint-04 18.11.-22.11.

W-51

Sprint-05 25.11.-29.11.

W-52

Sprint-05 02.12.-06.12.

Promises / Customer Info / Comments
Shop R3.3

Release 1: Reach BLT Testing

Includes Direct Handout Screen (with regular shipment as now), but not direct handout process, which is triggered after checkout.

ZS-SP-0002 App:ZUGSEIL Shop Checkout FE Presentations with SBB and BLT went fine Yes Done

BLT go-live @ 01.09.

Fully Fledged presentation with SBB 08.08.

BE
Shop R3.3

Release 2: Reach Ready-For-Testing with SBB

Finishing up & QA

Dev:EMA - Special actions screen FE Should be implemented

Presentation with SBB 16.09.

BE
zb MobileItemTracker (includes extensions on POS adm, Warehouse adm and Warehouse area adm) ZS-CI-0002 FE Živko QA testing Done Yes Done Rene confirmed
BE Nikola
App:Purchase order pool manager (Open Feature Requests, see versions page) FE Zivko 50% 80% 80%blocked 80%blocked 80%blocked 25.10.2024: Check account functionality still NOT specified
BE Nikola 50% 80% 80%blocked 80%blocked 80%blocked
Measuring-In

Oct 2023

ZS-CI-0001 App:Measuring-In - Target selection FE Standalone version, fully responsive, same Measuring-In-Methods as in Shop-API, another measuring-In-Singleton or part of Equipment Management Singleton?

Promised to Albiro for Q1/2024

First version done for presentation, awaiting for feedback

OPEN POINTS: (1) make it work with EBusinessSharedLogicHub, (2) REMOTE measuring in process yet to be implemented, (3) customer feedback

BE
App:Measuring-In - Product configuration FE
BE
App:Measuring-In - Body measurements FE
BE
SBB Forgotten Features

May 2024

ZS-CI-0003 New appointment Connector & Final BE with caching BE Trajko Also holds two minor tasks on the forgotten Feature list

Integration not scheduled yet

Stocktaking (AUA) - minor fixes DEV-524 FE Petar 10% QA testing Done Yes Done Rene confirmed
BE Nikola 10%
Stocktaking extensions for AUA prepared shipments inventory process Extensions on Warehouse area for "exclusive shipments" flag FE Zivko Done 15.11.2024. version put on FTP, Rene noted
BE Nikola Done
Extensions on Stocktaking app for new inventory type "pick up shipment stocktaking" FE Zivko 60% 100% Done
BE Nikola 60% 100% Done
Extensions on Pick up manager app also for "exclusive shipments" FE Zivko
BE Nikola
Unplanned WPC (MVC) extensions BE Nikola 0% 100% Done
ERP sprint 05 features and extensions PO pool manger - cost controlling extensions + feedback FE Petar 90% Done
BE Ivan 100% Done
Article / Product extension (variants generator for IROC) FE Zivko 90% Done
BE Ivan 100% Done
PO pool manager - Pool templates creation FE Petar 0% 90%
BE Ivan 0% 90%

Related articles