Difference between revisions of "Production order"

From ZUGSEIL Wiki
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:


* Checking for acceptance
* Checking for acceptance
* [[Production planning]] - This means blocking resources (material, HR, machine capacity) for this production order
* [[Dev:Production plan|Production planning]] - This means blocking resources (material, HR, machine capacity) for this production order
* Production - This means production floor tracking and production
* Production - This means production floor tracking and production
* Production Quality Control checking - This means confirmation of the quality of the products
* Production Quality Control checking - This means confirmation of the quality of the products
* Taking into stock
* Taking into stock
== Related articles ==
* [[Fulfillment]] - Production of items demanded by the organization is one possible way of internal demand fulfillment. Also production required materials, which have to become fulfilled for production to take place.

Latest revision as of 19:44, 5 November 2024

When a production order was placed, it has to undergo these steps:

  • Checking for acceptance
  • Production planning - This means blocking resources (material, HR, machine capacity) for this production order
  • Production - This means production floor tracking and production
  • Production Quality Control checking - This means confirmation of the quality of the products
  • Taking into stock

Related articles

  • Fulfillment - Production of items demanded by the organization is one possible way of internal demand fulfillment. Also production required materials, which have to become fulfilled for production to take place.