| rowspan="4" |[[App:ZUGSEIL Shop|'''Shop R3.3''']]
| rowspan="2" |[[App:ZUGSEIL Shop|'''Shop R3.3''']]
Release 1: Reach BLT Testing
Release 1: Reach BLT Testing


{{Yellow-Tag|Text=Includes Direct Handout Screen (with regular shipment as now), but not direct handout process, which is triggered after checkout}}.
{{Yellow-Tag|Text=Includes Direct Handout Screen (with regular shipment as now), but not direct handout process, which is triggered after checkout}}.
| rowspan="7" |ZS-SP-0002
| rowspan="4" |ZS-SP-0002
| rowspan="2" |[[Dev:EMA - Product Details Screen]]
(is [[Dev:ZUGSEIL SHOP - Product Details Screen]])
|FE
|
|
|
|
|
|
|
|
|
|
| rowspan="2" |Presentations with SBB and BLT went fine {{Done}}
|-
|BE
|
|
|
|
|
|
|
|
|
|
|-
| rowspan="2" |[[Dev:ZUGSEIL Shop - Checkout Screens Flow|App:ZUGSEIL Shop Checkout]]
| rowspan="2" |[[Dev:ZUGSEIL Shop - Checkout Screens Flow|App:ZUGSEIL Shop Checkout]]
|FE
|FE
|
|
|
|
|
Line 273: Line 243:
|-
|-
|BE
|BE
|
|
|
|
|
Line 290: Line 259:
| rowspan="2" |[[Dev:EMA - Special actions screen]]
| rowspan="2" |[[Dev:EMA - Special actions screen]]
|FE
|FE
|
|
|
|
|
Line 304: Line 272:
|-
|-
|BE
|BE
|
|
|
|
|
|
|
|
|
|
|-
|Moving logic from Connectors to E-BusinessCache
|Ivan
|
|90%
|
|
|
|
|
Line 334: Line 286:
| rowspan="2" |
| rowspan="2" |
|FE
|FE
|
|Živko
|Živko
| rowspan="2" |{{Yellow-Tag|Text=QA testing}}
| rowspan="2" |{{Yellow-Tag|Text=QA testing}}
Line 347: Line 298:
|-
|-
|BE
|BE
|
|Nikola
|Nikola
|
|
Line 360: Line 310:
| rowspan="2" |
| rowspan="2" |
|FE
|FE
|
|
|
|Zivko
|Zivko
Line 373: Line 322:
|-
|-
|BE
|BE
|
|
|
|Nikola
|Nikola
Line 389: Line 337:
| rowspan="2" |[[App:Measuring-In]] - Target selection
| rowspan="2" |[[App:Measuring-In]] - Target selection
|FE
|FE
|
|
|
|
|
Line 407: Line 354:
|-
|-
|BE
|BE
|
|
|
|
|
Line 420: Line 366:
| rowspan="2" |[[App:Measuring-In]] - Product configuration
| rowspan="2" |[[App:Measuring-In]] - Product configuration
|FE
|FE
|{{Yellow-Tag|Text=QA testing}}
|
|
|
|
Line 432: Line 377:
|-
|-
|BE
|BE
|{{Yellow-Tag|Text=QA testing}}
|
|
|
|
Line 445: Line 389:
| rowspan="2" |[[App:Measuring-In]] - Body measurements
| rowspan="2" |[[App:Measuring-In]] - Body measurements
|FE
|FE
|95%
|
|
|
|
Line 457: Line 400:
|-
|-
|BE
|BE
|95%
|
|
|
|
Line 473: Line 415:
|New appointment Connector & Final BE with caching
|New appointment Connector & Final BE with caching
|BE
|BE
|Trajko
|Trajko
|Trajko
|
|
Line 490: Line 431:
| rowspan="2" |
| rowspan="2" |
|FE
|FE
|
|
|
|
|
Line 503: Line 443:
|-
|-
|BE
|BE
|
|
|
|
|
Line 516: Line 455:
| rowspan="2" |Extensions on [[App:Warehouse area administration|Warehouse area]] for "exclusive shipments" flag
| rowspan="2" |Extensions on [[App:Warehouse area administration|Warehouse area]] for "exclusive shipments" flag
|FE
|FE
|
|
|
|
|
Line 529: Line 467:
|-
|-
|BE
|BE
|
|
|
|
|
Line 542: Line 479:
| rowspan="2" |Extensions on [[App:Stocktaking|Stocktaking]] app for new inventory type "pick up shipment stocktaking"
| rowspan="2" |Extensions on [[App:Stocktaking|Stocktaking]] app for new inventory type "pick up shipment stocktaking"
|FE
|FE
|
|
|
|
|
Line 555: Line 491:
|-
|-
|BE
|BE
|
|
|
|
|
Line 569: Line 504:
| rowspan="2" |Extensions on [[App:Point-Of-Service - Pickup|Pick up manager]] app also for "exclusive shipments"
| rowspan="2" |Extensions on [[App:Point-Of-Service - Pickup|Pick up manager]] app also for "exclusive shipments"
|FE
|FE
|
|
|
|
|
Line 582: Line 516:
|-
|-
|BE
|BE
|
|
|
|
|
Line 596: Line 529:
|Unplanned WPC (MVC) extensions
|Unplanned WPC (MVC) extensions
|BE
|BE
|
|
|
|
|
Line 612: Line 544:
| rowspan="2" |PO pool manger - cost controlling extensions + feedback
| rowspan="2" |PO pool manger - cost controlling extensions + feedback
|FE
|FE
|
|
|
|
|
Line 625: Line 556:
|-
|-
|BE
|BE
|
|
|
|
|
Line 640: Line 570:
| rowspan="2" |Article / Product extension (variants generator for IROC)
| rowspan="2" |Article / Product extension (variants generator for IROC)
|FE
|FE
|
|
|
|
|
Line 653: Line 582:
|-
|-
|BE
|BE
|
|
|
|
|
Line 668: Line 596:
| rowspan="2" |PO pool manager - Pool templates creation
| rowspan="2" |PO pool manager - Pool templates creation
|FE
|FE
|
|
|
|
|
Line 681: Line 608:
|-
|-
|BE
|BE
|
|
|
|
|
Line 696: Line 622:
| rowspan="2" |Pick up manager - Extension for pick up shipments (strech goal)
| rowspan="2" |Pick up manager - Extension for pick up shipments (strech goal)
|FE
|FE
|
|
|
|
|
Line 709: Line 634:
|-
|-
|BE
|BE
|
|
|
|
|

Revision as of 08:40, 29 November 2024

Team availability

This map holds the ZUGSEIL product development team and its planned availability during the upcoming days. If anything changes to this availability, please notify the line and the product manager as soon as possible.

Mon Tue Wed Thu Fri Mon Tue Wed Thu Fri
Name Function 25.11. 26.11 27.11 28.11 29.11 02.12 03.12 04.12 05.12 06.12
Stefan Seiler Product Owner
Rene Schneider Process Quality Manager
Christiane Hornemann UI Quality Manager
Davor Ciric Senior Delivery Manager
Tijana Bezbradica Delivery Manager
Ilija Bubanj Quality Engineer
Nikola Kerkez Backend Developer
Petar Ilic Frontend developer
Aleksandar Lazic Frontend developer
Zivko Rankovic Frontend developer
Ivan Juras Backend developer
Nebojsa Trajkovic B-Op developer

Regular vacation requests are applied to over this page, please.

Development tasks

This contains the tasks at the entire team. Each week contains these information according to the progess of the task:

  • Phase 1: RFD Ready for Development
  • Phase 2: In development --> Progress in %
  • Phase 3: DEV testing - Developers finished development but are doing QA on their code
  • Phase 4: QA testing - QA is having this on their table
  • Phase 5: Fixing - QA returned with some flaws
  • Phase 6: Code review - The code will be reviewed
  • Phase 7: Done - Ready for deployment

Planned Tasks

TOPIC/Project

Task creation

WBS / Project FE

BE

W-43

Sprint-01 30.09.-04.10.

W-44

Sprint-01 07.-11.10.

W-45

Sprint-02 14.-18.10.

W-46

Sprint-02 21.-25.10.

W-47

Sprint-03 28.10.-01.11.

W-48

Sprint-03 04.11.-08.11.

W-49

Sprint-04 11.11.-15.11.

W-50

Sprint-04 18.11.-22.11.

W-51

Sprint-05 25.11.-29.11.

Promises / Customer Info / Comments
Shop R3.3

Release 1: Reach BLT Testing

Includes Direct Handout Screen (with regular shipment as now), but not direct handout process, which is triggered after checkout.

ZS-SP-0002 App:ZUGSEIL Shop Checkout FE Presentations with SBB and BLT went fine Yes Done

BLT go-live @ 01.09.

Fully Fledged presentation with SBB 08.08.

BE
Shop R3.3

Release 2: Reach Ready-For-Testing with SBB

Finishing up & QA

Dev:EMA - Special actions screen FE Should be implemented

Presentation with SBB 16.09.

BE
zb MobileItemTracker (includes extensions on POS adm, Warehouse adm and Warehouse area adm) ZS-CI-0002 FE Živko QA testing Done Yes Done Rene confirmed
BE Nikola
App:Purchase order pool manager (Open Feature Requests, see versions page) FE Zivko 50% 80% 80%blocked 80%blocked 80%blocked 25.10.2024: Check account functionality still NOT specified
BE Nikola 50% 80% 80%blocked 80%blocked 80%blocked
Measuring-In

Oct 2023

ZS-CI-0001 App:Measuring-In - Target selection FE Standalone version, fully responsive, same Measuring-In-Methods as in Shop-API, another measuring-In-Singleton or part of Equipment Management Singleton?

Promised to Albiro for Q1/2024

First version done for presentation, awaiting for feedback

OPEN POINTS: (1) make it work with EBusinessSharedLogicHub, (2) REMOTE measuring in process yet to be implemented, (3) customer feedback

BE
App:Measuring-In - Product configuration FE
BE
App:Measuring-In - Body measurements FE
BE
SBB Forgotten Features

May 2024

ZS-CI-0003 New appointment Connector & Final BE with caching BE Trajko Also holds two minor tasks on the forgotten Feature list

Integration not scheduled yet

Stocktaking (AUA) - minor fixes DEV-524 FE Petar 10% QA testing Done Yes Done Rene confirmed
BE Nikola 10%
Stocktaking extensions for AUA prepared shipments inventory process Extensions on Warehouse area for "exclusive shipments" flag FE Zivko Done 15.11.2024. version put on FTP, Rene noted
BE Nikola Done
Extensions on Stocktaking app for new inventory type "pick up shipment stocktaking" FE Zivko 60% 100% Done
BE Nikola 60% 100% Done
Extensions on Pick up manager app also for "exclusive shipments" FE Zivko 0% 0% 0%
BE Nikola 0% 0% 0%
Unplanned WPC (MVC) extensions BE Nikola 0% 100% Done
ERP sprint 05 features and extensions PO pool manger - cost controlling extensions + feedback FE Petar 90%
BE Ivan 100%
Article / Product extension (variants generator for IROC) FE Zivko 90%
BE Ivan 100%
PO pool manager - Pool templates creation FE Petar 0%
BE Ivan 0%
Pick up manager - Extension for pick up shipments (strech goal) FE