Difference between revisions of "Production order"
Jump to navigation
Jump to search
Stefanseiler (talk | contribs) m (Stefanseiler moved page Production Order to Production order without leaving a redirect) |
Stefanseiler (talk | contribs) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
[[Category:Order Types and related objects]] | [[Category:Order Types and related objects]] | ||
[[ | When a production order was placed, it has to undergo these steps: | ||
* Checking for acceptance | |||
* [[Dev:Production plan|Production planning]] - This means blocking resources (material, HR, machine capacity) for this production order | |||
* Production - This means production floor tracking and production | |||
* Production Quality Control checking - This means confirmation of the quality of the products | |||
* Taking into stock | |||
== Related articles == | |||
* [[Fulfillment]] - Production of items demanded by the organization is one possible way of internal demand fulfillment. Also production required materials, which have to become fulfilled for production to take place. |
Latest revision as of 19:44, 5 November 2024
When a production order was placed, it has to undergo these steps:
- Checking for acceptance
- Production planning - This means blocking resources (material, HR, machine capacity) for this production order
- Production - This means production floor tracking and production
- Production Quality Control checking - This means confirmation of the quality of the products
- Taking into stock
Related articles
- Fulfillment - Production of items demanded by the organization is one possible way of internal demand fulfillment. Also production required materials, which have to become fulfilled for production to take place.