Difference between revisions of "Production order"
Jump to navigation
Jump to search
Stefanseiler (talk | contribs) |
Stefanseiler (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
* Checking for acceptance | * Checking for acceptance | ||
* [[Production planning]] - This means blocking resources (material, HR, machine capacity) for this production order | * [[Dev:Production plan|Production planning]] - This means blocking resources (material, HR, machine capacity) for this production order | ||
* Production - This means production floor tracking and production | * Production - This means production floor tracking and production | ||
* Production Quality Control checking - This means confirmation of the quality of the products | * Production Quality Control checking - This means confirmation of the quality of the products | ||
* Taking into stock | * Taking into stock | ||
== Related articles == | |||
* [[Fulfillment]] - Production of items demanded by the organization is one possible way of internal demand fulfillment. Also production required materials, which have to become fulfilled for production to take place. |
Latest revision as of 19:44, 5 November 2024
When a production order was placed, it has to undergo these steps:
- Checking for acceptance
- Production planning - This means blocking resources (material, HR, machine capacity) for this production order
- Production - This means production floor tracking and production
- Production Quality Control checking - This means confirmation of the quality of the products
- Taking into stock
Related articles
- Fulfillment - Production of items demanded by the organization is one possible way of internal demand fulfillment. Also production required materials, which have to become fulfilled for production to take place.